Wingham Health Centre Clinic

Project Value:

$3,950,000

Owner:

Listowel Wingham Hospital Association

Consultant:

The Ventin Group Limited

Challenge:

  • Renovate a former community Clinic, in an old school building, into a modern Health Centre
  • Expand the clinic by transforming the old gymnasium into a two storey clinical facility
  • Upgrade the facility to incorporate new technology and to be capable of advancing technologically in the future

Objective:
Renovate the former school gymnasium to create a two storeys health centre by adding a new floor structure, a two storey addition on the north side of the building, a one storey addition on the east side of the building, and associated pharmacy, reception and waiting area, and staff offices. The new 13,000sqft centre also needed to be completely accessible.

[More]

Elgin-Middlesex Detention Centre (EMDC) Intermittent Facility

Project Value:

$10,146,000

Owner:

Ministry of Community Safety and Correctional Services

Consultant:

NORR Ltd.

Challenge:

  • Design a secure facility for intermittents (individuals sentenced to jail time of 30 days or less) inside the high security fence but segregated from the inmates serving long-term sentences
  • Build a post tensioned membrane structure
  • Require design approval by Detention Ontario and the union representing the Guards
  • Design needed to meet the Province's mandated security levels while giving the inmates a friendlier surrounding
  • Ensure a safe environment for guards

Objective:
Design and build a safe and secure environment to house 120 weekend inmates while keeping the weekend internment centre separate from the long-term prison population. Prisons are traditionally very expensive to build and maintain. Correctional services wanted a “weekend” solution that would be easily maintained, secure, yet cost effective.

[More]

St. Ann Catholic Elementary School-Hamilton

Project Value:

$10,500,000

Owner:

Hamilton-Wentworth Catholic District School Board

Consultant:

Sam Espostos Architects Ltd.

Challenge:

  • Footprint of new school and adjacent church presented unique challenges
  • East and south foundations of the new building were located close to an adjacent property, allowing a space of only 1,200 mm to the east neighbour
  • Tight conditions also required very close coordination and careful planning to execute the building exterior veneer over the two-storey height

Objective:
Construct a two storey, 20 classroom, 48,000 SF school on a small parcel of land located very close to adjacent properties, while providing ongoing access to the church's parking area throughout construction.

[More]